Skip to content

Maria Sklodowska-Curie Memorial Cancer Center and Institute of Oncology

Poland, Gliwice

Halton Vita Iso solution has been installed in isolation rooms in the Gliwice branch of the largest oncology facility in Poland – Maria Sklodowska-Curie Memorial Cancer Center and Institute of Oncology.

The Halton Vita Iso solution allows the staff to select the desired mode of operation in accordance with their needs. This solution can maintain either a positive or negative pressure and even allows conversion into a contact isolation or patient room with neutral pressure what makes the solution flexible and adjustable to the hospital’s current situation.

This flexibility was very important feature for the Center, as well as the possibility to have the overview of the rooms conditions in real time.

Halton has installed in Cancer Center: control and monitoring panels, room airflow control for anterooms and isolation rooms and Halton Vita HEPA diffusers.

Halton has also done the commissioning and validation of the solution.

Halton Vita Iso solution includes the Halton Vita supervisory panel, which is usually installed in the nurse room and so it was in Gliwice Institut as well.

Halton Vita supervisory panel enables the staff to monitor the conditions in real time and change the conditions remotely.