Opened in September 2014, the Central Kitchen in Lyon produces and manages 25000 meals a day prepared by 60 employees. The maximum capacity will reach 35 to 37000 meals a day with up to 90 employees.
On a surface of 3000m², this central kitchen serves 125 school canteens.
Central Kitchen Lyon has chosen Halton Solutions for the ventilation of their kitchen.